Hey, just wondering if anyone has any advice...
This is what I setup.
1 reactor, with two 80 blade turbines attached, the reactor can output 20% more steam than I need to run the two turbines at 1600RPM, and the capacitors have billions of RF to fill.
What happens, is the turbines get set to 800RPM instead of 1600RPM and the reactor gets under utilized.
What do I need to do?
1. Just attach the reactor to the computer?
2. Attach the Reactor and Turbines?
3 or just Turbines?
I simply want the reactor to run at optimal to feed the turbines the steam required to run