I'm having trouble getting my reactor to leave calibration mode. The reactor enters calibration mode and the control rods get inserted to 99% immediately, but then nothing ever finishes.
Is there a minimum size requirement for the active reactor maybe?
Big Reactors Grid Control
in Programs
Posted
I'm having trouble getting my reactor to leave calibration mode. The reactor enters calibration mode and the control rods get inserted to 99% immediately, but then nothing ever finishes.
Is there a minimum size requirement for the active reactor maybe?